Integrated Schedule
Company-wide high-level schedule. View only.
DEV
—
Not signed in
Production read only
Access Request Pending
Your NuFrame Microsoft identity is verified. An Administrator must approve NCC access and department permissions before operational data is available.
Active Projects0
Upcoming Projects0
Projected Dates MetN/A
Schedule reliability
Delays0
Same-project dates moved worse
Attention Required0
Integrated Master Schedule
High level: Embeds • Slab • Design • Production • Framing
Active Projects0
Upcoming Projects0
Date ChangesN/A
Same-Project Conflicts0
Operations Schedule
Open Milestones0
On Track0
At Risk0
Projected Late0
Today's Production
Loading
Source freshness unavailable
Today's Output by Production Line
Production Planning Tool
Waterfall build order. Drag Production bars. Drag either edge to adjust duration.
Source ConstraintGenerated RecommendationScheduled PlanOptimized ScenarioShipment PendingPlant-wide Production Gap
Commit Manual Production Plan
Edit the dates above or drag/resize the Production block. Commit changes only when the plan is correct. Source constraints and the generated recommendation remain unchanged.
Today's Production
Loading
Source freshness unavailable
Today's Project Contribution
Active Projects0
5-Day Avg LF / Day0 LF
Needed LF / Day0 LF
Pipeline Capacity0%
Projected Average Panel DwellUnavailable
Planned / Total LFUnavailable
Portfolio Framing CompleteUnavailable
Design CompleteUnavailable
Production Scope CompleteUnavailable
Deliveries • Next 7 Days0
Optimization ScoreUnavailable
Avg Design / Production LeadUnavailable
Upcoming Production Gap Days0
Zero scheduled plant Production
Capacity + Order File Outlook
Forward 12-Month Outlook
Below 60%60–79%80–100%Over 100%
Monthly order-file LF ÷ working-day capacity at the 1,500 LF/day target. Accepted Production dates are used where available; otherwise the preliminary Production window keeps unplanned packages in the outlook.
Executive Insights
Production Output
Daily plant LF from Wall Stack Completion, plus reconciled NCC manual entries where source output is absent.
Moving averages
Order File
All current and upcoming framing commitments, independent of Production planning and the capacity month filter.
| Status | Project | Framing Start | Framing End | Production Outlook |
|---|
Executive Weekly Report
Generate the executive portfolio, production and order-file brief.
Active Project Progress
Current active schedules and projects with matched Production packages. Historical projects are excluded.
Active Project Progress
Current active schedules and projects with matched Production packages. Historical projects are excluded.
| Project | Design | Production | Framing | Next Delivery |
|---|---|---|---|---|
| Live portfolio progress is loading. | ||||
General Settings
Available to all users.
Production read only
Access is determined by the authenticated NCC account. General Settings remain available to everyone.
Install availability is being checked.
