Integrated Schedule
Company-wide high-level schedule. View only.
DEV
—
Not signed in
Production read only
Access Request Pending
Your NuFrame Microsoft identity is verified. An Administrator must approve NCC access and department permissions before operational data is available.
Active Projects0
Upcoming Projects0
Projected Dates MetN/A
Schedule reliability
Delays0
Same-project dates moved worse
Attention Required0
Integrated Master Schedule
High level: Embeds • Slab • Design • Production • Framing
Panels
Prefabrication release historyOpen Milestones0
On Track0
At Risk0
Projected Late0
Today's Production
Loading
Source freshness unavailable
Today's Output by Production Line
Working On Today · Project Contribution
Schedule Overview
Live Production demand, lead times and planning health
Needed LF / DayLoading
Full Monday–Friday scheduled LF ÷ 5
Upcoming Production Gap DaysLoading
Next 30 working days with zero scheduled plant Production
Upcoming ChangeoversLoading
Project switches · next 5 working days
Active ProjectsLoading
Projects with visible Production plans
Average DwellLoading
LF-weighted actual Production to Framing consumption · working days
Projected DwellLoading
Current month · planned Production finish → Framing start · working days
Production Lead AvgLoading
Current month · Production start → active Framing start · working days
Design Lead AvgLoading
Recorded Design release → planned Production start · working days
Optimization ScoreLoading
Dwell, Production-to-Framing timing, continuity, LF output and Production warnings.
HealthLoading
Pipeline Capacity · 30 DaysLoading
Optimal-window work vs configured baseline · next 30 calendar days
Notifications
Production overlaps, capacity and LF warnings
Production Queue
Current and upcoming saved Production plans · updates with the calendar · overlapping tasks may run together
Production Planning Tool
Waterfall build order. Drag Production bars. Drag either edge to adjust duration.
Source ConstraintGenerated RecommendationScheduled PlanOptimized ScenarioShipment PendingPlant-wide Production Gap
Commit Manual Production Plan
Leave blank for an automatic share. Shares are balanced within each half-day; all remaining LF is retained.
Edit the dates above or drag/resize the Production block. Commit changes only when the plan is correct. Source constraints and the generated recommendation remain unchanged.
Today's Production
Loading
Source freshness unavailable
LF per checked-in personUnavailable
Saved Team check-ins
Today's Project Contribution
Plant Capacity0%
Current month · load / baseline capacity
Optimization ScoreUnavailable
Dwell, lead timing and production continuity
Operating HealthLoading
Schedule and operational exceptions
5-Day AVG LF / DayUnavailable
Needed LF / Day · This WeekUnavailable
Projected Dwell AVGUnavailable
Next 30 days · working days
Active ProjectsUnavailable
DeliveriesUnavailable
Upcoming Production Gap DaysUnavailable
Next 30 days
AVG Head CountUnavailable
Latest five completed check-in days
AVG LFPPUnavailable
Latest five completed check-in days
Capacity + Order File Outlook
Forward 12-Month Outlook
Below 60%60–79%80–100%Over 100%
Monthly order-file LF ÷ working-day capacity at the configured LF/day baseline. Order-file LF is assigned to each package’s effective Framing Start month. Production output is controlled separately below.
Executive Insights
Production Output
Daily plant LF from Wall Stack Completion, plus reconciled NCC manual entries where source output is absent.
Moving averages
LFPP · Daily floor productivity
Daily LF ÷ saved Present check-ins · same period as Production Output · missing attendance shown as gaps
Order File
All current and upcoming framing commitments, independent of Production planning and the capacity month filter.
| Status | Project | Framing Start | Framing End | Production Outlook | Completed LF | Remaining LF | Production Complete |
|---|
Executive Weekly Report
Generate the executive portfolio, production and order-file brief.
Active Project Progress
Current active schedules and projects with matched Production packages. Historical projects are excluded.
Active Project Progress
Current active schedules and projects with matched Production packages. Historical projects are excluded.
| Project | Design | Production | Framing | Next Delivery |
|---|---|---|---|---|
| Live portfolio progress is loading. | ||||
General Settings
Available to all users.
Production read only
Access is determined by the authenticated NCC account. General Settings remain available to everyone.
Install availability is being checked.
